Connect with us

Bulloch Public Safety

AllOnAdventure Logo

SE Ga Road Work: Weekly Traffic Interruption Advisory Through April 14

Georgia DOT continues essential road work throughout Southeast Georgia.  As a result, work on construction and maintenance projects will continue Saturday, April 8 through Friday, April 14.

The Button - donate today!

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.

Traffic interruptions are listed below by interstates, categories, and counties.


Interstate 95

I-95                                                    McIntosh County
Champney R. Bridge (MP 45.5) to Darien R. Bridge (MP 49.0) 
Lane Closures Monday- Thursday 7pm-7am &
Weekends – Friday 9pm until Monday 5am
Bridge Maintenance/Rehabilitation thru October 2023

Interstate 16                            

I-16 (in the Vicinity of SR 307)        Chatham County            
Lane Closures for DDI Construction on I-16 & SR 307
Monday – Saturday
· I-16 eastbound from 9 a.m. to 4 p.m.
· I-16 westbound from 8 a.m. to 3 p.m.
· SR 307 North from 9 a.m. to 4 p.m.
· SR 307 South from 8 a.m. to 3 p.m.
Continue thru end of June 2023

Bridge & Road Closures with Detours

Ten Mile Church Road at 10 Mile Creek Bacon County
Road Closure for Bridge Replacement
Expected to Reopen in July 2023
Detour via Radio Station Rd, S Pierce St., SR 32, SR 203

Bell Telephone Road                             Jeff Davis County
Road Closure for Bridge Replacement
Expected to Reopen July 2023
Detour via Ira Graham Rd, Bridgeford Church Rd, Philadelphia Church Rd, Taylor Rd, Post Rd

Bridge Construction, Rehabilitation, and Maintenance

SR 520 Satilla River Overflow Bridge Brantley County
MP 19 to MP 21 (East/Positive)
Lane Closures for Bridge Replacement
Mon-Fri 7am-7pm from 3/9/2023 to 3/31/2024
East & West Bound Inside Lanes Closed

State Route 25                                   Chatham County 
Appleby Road (MP 19) to the South Carolina State Line
Alternating Lane Closures for Bridge Construction
Monday – Saturday 9am – 4pm

SR 4/US 1 Over Altamaha River      Appling-Toombs Co.
West River Rd. (Appling Co.) to George Hill Rd. (Toombs Co.)
Lane Closures Monday thru Friday, 7am to 6pm
Bridge Construction Activities thru May 2023

Resurfacing

SR 204/Fort Argyle Rd                     Chatham County
From Old River Rd to Gateway Blvd
Lane Closures for Asphalt Resurfacing
Monday – Friday, 7pm to 6am

SR 26/HWY 80                                  Chatham County
From Bourne Ave to Wilkes Street
Daily/Nightly Lane Closures 9pm to 6am

SR 196/SR 119                                  Liberty County
From Gate 1 to Gate 5 (MP 4.67 to 7.15)
Lane Closures 7pm to 5am Friday – Saturday

SR 119                                               Liberty County
From Airport Rd to SR 138 (MP.0 to 4.67)
Lane Closures 7pm to 5am Friday – Saturday

SR 21 Business 21 / Leola Road     Screven County 
MP 16.58 to MP 0
Daily Lane Closure & Flagging Operation
7am to 7pm
1/9/2023 – 4/30/2023

Old Highway 250                              Tattnall County
Mainline Left/Right Lane Closed due to Shoulder Widening
Monday – Saturday 7am – 8pm
Starting 2/27/2023 – 9/30/2023

SR 67 Bypass                                   Bulloch County
Fair Road to SR 26/US80
Daily Lane Closure 7am – 8pm
Resurfacing 3/20/2023 – 4/30/2023

SR130                                               Montgomery/Toombs Counties
From SR135 to US1/SR4
Daily Lane Closures 7am – 7pm
4/3/2023 – 5/31/2023

Other Traffic Interruptions

SR23/SR57                                         Tattnall County
SR169 to SR121
Daily Lane Closures for Road Widening
8am – 3pm
Starting 12/20/2022 – 12/10/2023

SR 21/SR 30                                      Chatham County
I-95/SR 405 to Berrien Rd                              
Nightly Lane Closures for Work on Striping
Monday – Friday 7pm-6am

SR 40                                                Camden County
West of Grove Blvd to East of Truss Plant Road
Widening and Reconstruction for Additional Turn Lanes
Lane Closures Monday thru Friday, 7am to 5pm
Ends 9/30/2023

SR 21 MP 6.6 to MP 27.7                   Effingham County
Installation of Cable Barrier
Lane Closures Mon. – Fri. 9am-3:30pm & 7pm-6am
Daily/Nightly Lane Closures Saturday and Sunday
3/31/2022 – 4/30/2023

SR 21 MP 17.7 to MP 15.0                 Chatham County
Installation of Cable Barrier
Lane Closures Mon. – Fri. 9am-3:30pm & 7pm-6am
Daily/Nightly Lane Closures Saturday and Sunday
03/03/2023 – 4/30/2023

SR 25/Burnsed Blvd.                        Chatham County
US 80/Burnsed Blvd. and SR 25/Brampton Rd.
Road Widening & Paving Operations
Lane Closures Mon. – Fri. 7am to 6pm

  • Burnsed Boulevard reduced to two lanes from Hwy 80 through

the intersection of SR 25. Traffic will move to the southbound lanes,
which will become one lane in each direction.

  • SR25 North from Bay Street closed to through traffic. Only trucks

needing access to Foundation Drive.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *